Lower Modi

lowermodi2

 

modiLower Modi Hydroelectric Project at KushmaMunicipality of Parbat district is an under construction project.  The developer of this project is Manang Trade Links Pvt. Ltd. It is a run of river type project and has the design discharge of 28.8 m3/s, gross head of 87.79 m and installed capacity of 20 MW. The average annual energy generation of the project is expected to be117.53 GWh. The energy generated from the project is evacuated through a 4.5 m long 132 kV transmission line to NEA substation at Patichaur, Parbat. The construction of the project is in full swing and almost 70% of headworks and 50% of underground works have been completed so far.

– Click  for – LMKHP Progress Report

 

– Click  for – Salient features

 