Ankhu

 Ankhu3


Ankhu Hydropower Project is run of river type project located at Ree, Darkha and Jharlang VDCs of Dhading. It has design discharge of 24 m3/s, gross head of 215 m and installed capacity of 42.9 MW. The average annual energy generation of the project is 227GWh. The energy generated from the project is evacuated through a 25 km long 132 kV transmission line to NEA substation at Nuwakot. The project has already signed grid connection agreement and process of Power Purchase Agreement (PPA) is in progress.